Description | 1. Construction of a tramway commencing at Cambridge Railway Station and passing along Station Road, Hills Road, Regent Street, St Andrews Street, Sidney Street, Bridge Street, Magdalene Street, Castle Street, Huntingdon Road, and terminating near Benson Street. 2. Branch leaving number 1 at Hyde Park Corner and passing along Gonville Place, East Road, Newmarket Road (Eastern End), and terminating outside the Dog and Pheasant Inn. 3. Branch leaving number 1 at the junction of Bridge Street, and Sidney Street, and passing along Jesus Lane, Maid's Causeway, Newmarket Road, and re-joining number 1 at East Road/Newmarket Road junction. Passing through the following parishes: 1. St Andrew the Less, St Benedict, St Andrew the Great, Holy Trinity, All Saints, Holy Sepulchre, St Clement, St Peter, St Giles (all in town of Cambridge); Chesterton (Cambridgeshire). 2. St Andrew the Less, St Benedict, Holy Trinity (all in Cambridgeshire). 3. All Saints, Holy Trinity, St Andrew the Less, St Benedict (all in Cambridge). Comprising: Plans and sections: 3 sheets, each 20" x 30" (2 copies). Scale: Plan and section: Horizontal 8 chains (176 yards) to 1 inch. Vertical 100 feet to 1 inch. Engineer: Augustus J.D.Cameron. |