Description | Title of Act. Cambridge University and Town Gas. Description. Construction of additional pipe lines in Coldhams Lane, Newmarket Road and River Lane, Cambridge, for the purpose of conveying oil from the company's sidings at Coldhams Lane to the gas works. (River Lane entrance). Passing through the following parish: St Andrew the Less, Cambridge. Comprising. Plan and section: 1 sheet, 23" x 30" (1 enrolled copy, 2 extra copies). Book of reference [missing]. Printed summary of bill. Scales. Plan and section. Vertical 8 feet to 1 inch. Horizontal 85 feet to 1 inch. Engineer. Richard Brown. Act 62-3 Victoria, ch.xl (1899) |