Record

RefNoKQ/RU/m119
AltRefNoQ/RUm119
TitleExtension to Wisbech of the Terrington and Walpole Tram Roads.
DescriptionTitle. Terrington and Walpole Tramroads (Extension to Wisbech). Description. The construction of three tramroads as follows: Tramroad number 1. Starting in the parish of Walpole St Peter (county Norfolk) North of Walpole Highway and terminating at West Walton Highway, parish of West Walton (county Norfolk). Tramroad number 2. Commencing near junction with Tramroad number 1 in West Walton (county Norfolk) and terminating near Eight Sail Mill, Lynn Road, Wisbech St Peter. Tramroad number 3. Wholly in parish of Wisbech St Peter commencing by a junction with Tramroad number 2 in junction with the Wisbech Harbour Branch of Great Eastern Railway, at a point 1.5 chains (33 yards) North of Lynn Road, Wisbech. Passing through the following parishes. Number 1. Walpoole St Peter (county Norfolk). Numbers 1 and 2. West Walton (county Norfolk). Number 2. Walsoken (county Norfolk). Numbers 2 and 3. Wisbech St Peter, Isle of Ely and county of Cambridge. Comprising. Plans and sections (2 copies) 22.5" x 30". 6 sheets. [signed copy badly damaged]. Ordnance survey sheet; scale 1" to 1 mile. Printed summary of bill. Scales. Plans and sections: Horizontal 3 chains (66 yards) to 1 inch. Vertical 40 feet to 1 inch. Engineers. Edward Easton and Co. Act. 53-54 Victoria, ch. ccxl, 1890.
Date30 November 1889
CreatorNameCambridgeshire Clerk of the Peace: Plans of Public Undertakings
RepositoryCambridgeshire Archives
Add to My Items